The Challenge
In today’s fast-paced logistics industry, efficient parcel sorting is critical for ensuring timely delivery and customer satisfaction. As Evri’s operational requirements grew, they naturally faced challenges in meeting their commitments due to their limitations in handling large volumes and diverse parcel types.
The existing operations were highly labour dependent and the entire unloading, inbound, sortation and dispatch was carried out using manually hauled cages. The labour challenge also introduced systematic errors of parcel damages, inaccurate sortation, and wrong dispatches.
This led them to partner with L-A-C Logistics Automation for a project aimed at addressing these challenges and optimizing their parcel sorting process.